December 28, 2022

King Street, Clontarf, Moreton Bay Regional Council

by Virginija Meilune in Case Studies

January 2021

King Street, Clontarf, Moreton Bay Regional Council

Moreton Bay Regional Council required a large section of King Street to be resurfaced due to basecourse failures – the road is a busy connector route and a main thoroughfare for local traffic.

The high demand on the pavement required an asphalt solution which would provide superior performance but also be cost competitive and with minimal carbon emissions in its production and application.

The existing pavement was resurfaced using an asphalt mix -created using Entyr’s recovered carbon black (eCB) the mix and tyre-derived hydrocarbon (eTDFO) in processing.

0
Tyres repurposed
0
kg of CO2e saved